This paper reports short-term performance measurement of a hybrid photovoltaic/fuel cell power supply system at Kirby Cove Campground in Golden Gate National Recreation Area, California. The system operated reliably for two years from June 1999 to July 2001. During this period, the campground host load was met with a combination of solar power and power from the fuel cell. In August of 2001, reports of power outages justified an in-depth investigation. Data is reported over 13.5 days from September 2 to September 15,2001. Over this period, energy delivered by the photovoltaic array totaled 42.82 kWh. Energy delivered by the fuel cell totaled 1.34 kWh, and net (out-in) energy from the battery totaled 6.82 kWh. After losses in the battery and inverter, energy delivered to the campground host totaled 34.94 kWh, an average of 2.6 kWh/day. Photovoltaic efficiency was measured at 8.9%. Fuel cell efficiency was measured at 42%, which is a typical value, but fuel cell power output was only 35 W instead of the 250 W rated power. Replacing a burnt fuse restored fuel cell power to 125 W, but several cells measured low voltage, and the fuel cell was removed for repair or replacement. Ordinarily, load in excess of the PV capability would be met by the fuel cell, and 22 cylinders of H_2 (261 scf, 7,386 sl each) were consumed from April to August 2001. After failure of the fuel cell, load in excess of the solar capability resulted in discharged batteries and eight power outages totaling 48 hours in duration. Thus, overall system availability was 85% when relying only on solar power. This paper describes daily system operation in detail, presents component performance indicators, identifies causes of performance degradation, and provides recommendations for improvement.
机译:本文报告了加利福尼亚金门国家游乐区Kirby Cove露营地的混合光伏/燃料电池供电系统的短期性能测量。从1999年6月到2001年7月,该系统可靠地运行了两年。在此期间,露营地的主机负载由太阳能和燃料电池提供的动力来满足。 2001年8月,停电的报告证明了进行深入调查的合理性。报告的数据为2001年9月2日至9月15日,共13.5天。在此期间,光伏阵列传递的能量总计为42.82 kWh。燃料电池提供的能量总计1.34 kWh,电池的净(出入)能量总计6.82 kWh。在电池和逆变器损耗之后,传递到露营地主机的能量总计34.94 kWh,平均每天2.6 kWh。测得的光伏效率为8.9%。燃料电池效率的测量值为42%,这是一个典型值,但是燃料电池的功率输出仅为35 W,而不是250 W的额定功率。更换烧断的保险丝可使燃料电池的功率恢复到125 W,但是几个电池的电压较低,因此已卸下燃料电池进行修理或更换。通常,燃料电池可以满足超过PV能力的负荷,从2001年4月至2001年8月,消耗了22缸H_2(261 scf,每个7,386 sl)。燃料电池失效后,超过太阳能能力导致电池放电,并且八次断电,持续时间总计48小时。因此,仅依靠太阳能时,整个系统的可用性为85%。本文详细描述了系统的日常运行,提出了组件性能指标,确定了性能下降的原因,并提出了改进建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号