首页> 外文会议>SPE annual technical conference and exhibition;SPE 2002 >Active Feedback Control of Unstable Wells at the Brage Field
【24h】

Active Feedback Control of Unstable Wells at the Brage Field

机译:Brage场不稳定井的主动反馈控制

获取原文
获取原文并翻译 | 示例

摘要

In this paper we will present new results on stabilization ofrnhorizontal wells with gas lift. The stabilization is achieved byrna novel dynamic feedback control solution using thernproduction choke at the wellhead. The primary input to therndynamic feedback controller is a measurement of therndownhole pressure.rnThe field results to be presented are from the Brage fieldrnoperated by Norsk Hydro in the North sea. Production atrnBrage began in 1993 and the field went off plateau in 1998. Asrnthe production has decreased, the problems related to unstablernproduction from some of the wells have escalated steadily.rnThe results from the extensive field tests on the Brage wellsrnare very promising. The tests have confirmed the stabilizationrnfeature of the control solution. The pressure and flowrnvariations have been dramatically reduced, and it is possible tornproduce the wells at a lower downhole pressure leading tornincreased production.
机译:在本文中,我们将介绍利用气举稳定水平井的新结果。通过使用井口生产节流阀的新型动态反馈控制解决方案来实现稳定。动态反馈控制器的主要输入是井下压力的测量值。要显示的现场结果来自北海Norsk Hydro钻探的Brage油田。 Brage油田的生产开始于1993年,1998年油田停产。由于产量下降,与某些井的产量不稳定有关的问题正在稳步升级。Brage井的广泛现场测试结果非常有希望。测试已经证实了对照溶液的稳定性。压力和流量变化已大大降低,有可能在较低的井下压力下打井,从而导致产量增加。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号