【24h】

利根川下流部河道改修の変遷と浚渫の効果

机译:低调河道改善过渡及疏of效果

获取原文
获取原文并翻译 | 示例

摘要

利根川下流域は、明治33年の国直轄による改修工事着手以来、浚渫と築堤による改修が行われてきた。平成18年に策定された利根川水系河川整備基本方針(以下「基本方針」という)及び今後策定される利根川水系河川整備計画においても、河口から佐原までの40km区間での浚渫は主要事業になると想定されている。%River improvement works of the lower Tone River had begun in the Meiji 33rd (1900) and channel form close to the today's river was made mainly by widening of the river cross-sections. A new river from Sawara to confluence section of Hitachi-tone River (20 to 40km from the river mouth) was made by channel excavation and connected to a region with a wide water surface area which extends from the river mouth. After that period, the present channel form has been constructed by dredging and creating flood channels.rnThe present paper reports chronological change of the lower Tone River improvement works mainly by channel dredging on the basis of Tone river improvement plan of Showa 24th (1949) and assesses effectiveness and today'issue of implementation works.
机译:自1933年在国家政府的直接控制下开始进行翻新工程以来,通河下游地区已通过疏ed和堤坝进行了修复。在2006年制定的《通河水系河道养护基本政策》(以下简称“基本政策”)和将来制定的《通河水系河道养护计划》中,假设从河口到沙瓦拉的40公里路段的疏ging将是一项重大工程。已经完成。下音河的改建工程始于明治33年(1900年),主要通过扩大河道断面来形成今天的河道。从佐原市到日立口合流段的新河河流(距河口20至40公里)是通过河道开挖而形成的,并与从河口延伸出的具有较大水表面积的区域相连。此后,通过疏and和创建洪水河道来构造当前河道形式.rn本文根据昭和二十四日(1949年)的通河整治计划,主要通过河道疏reports来报告通河下游整治工程的时间变化,并评估其有效性和今天的实施工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号