首页> 外文会议>4th International Pipeline Conference, Sep 30-Oct 3, 2002, Calgary >THE OIL AND GAS NATIONAL MASTER STATIONS OF TRANSPETRO ― DESIGN AND IMPLEMENTATION
【24h】

THE OIL AND GAS NATIONAL MASTER STATIONS OF TRANSPETRO ― DESIGN AND IMPLEMENTATION

机译:跨国家石油和天然气国家主管部门―设计与实施

获取原文
获取原文并翻译 | 示例

摘要

This paper presents the design and implementation of Transpetro's national master station project for oil and natural gas. The national master stations allow the centralized operation of Transpetro's entire liquid and natural gas pipeline grid from their new headquarters in Rio de Janeiro. The implementation strategy includes transferring operations of the existing regional master stations ― four for oil and two for gas ― to the national master. Two of the regional masters are maintained as backups for the oil and gas national master stations, respectively. The project foresees the total deactivation of the existing regional master stations as their operations are migrated to the national master. The national master stations complement Transpetro's integrated oil and gas SCADA systems.
机译:本文介绍了Transpetro国家石油和天然气主站项目的设计和实施。国家级主站允许Transpetro在里约热内卢的新总部集中运营整个液体和天然气管道网格。实施策略包括将现有区域主站的操作(四个用于石油,两个用于天然气)转移到国家主站。维护了两个区域主站,分别作为石油和天然气国家主站的备用站。该项目预见到现有的区域主站的运营将全部停用,因为它们的运营将迁移到国家主站。国家主站是Transpetro集成的油气SCADA系统的补充。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号