Fueling Station and Tank Farm Expansion on Taboguilla Island

机译:塔波圭拉岛的加油站和油库扩建

获取原文

摘要

Taboguilla is a small island located 10 miles outside the Panama Canal Pacific Entrance. In 2002 a fueldistribution facility was installed in order to supply fuel to vessels passing thru the canal. The currentcapacity of the tank farm is equivalent to 1,100,000 barrels. The demand for marine diesel at thislocation still exceeds the current capacity, thus an expansion project is currently underway to increasethe available space for diesel tanks. There is a total of 800,000 cubic meters to be excavated in order tocreate the new space. 400,000 cubic meters of that total is basalt rock which will need to be blasted.There are multiple things to consider in order to successfully execute this project. The foremostchallenges include logistics for explosive transportation from inland magazines to the island,coordination with the customer to avoid blasting while vessels are fueling, the design of patterns thatcomply with the peak particle velocity limits of tank structures and the avoidance of rock projection.Each of these vital parts must be well coordinated for each blast.The new tank area is to be located adjacent to the current tank farm area and will be divided into twodistinct benches. Blasting will start at 70 meters above sea level and will come down to 35 meters for thetop bench and 22 meters for the final bench. Blast patterns so far are limited to a depth of 11.5 metersand a 4.0 meter by 4.0 meter pattern. Current distance to the structures is about 90 meters but as theproject advances blasts will be as close as 20 meters from the pipeline that runs from the tanks to thedocking area. In preparation for this critical stage, a detailed report is completed for each blast. Thisreport includes the amount of explosives per borehole, the timing scheme, seismograph readings forstructures of concern and the blast video.Structures of concern include 35,000 cubic meter fuel tanks, potentially unstable benches above thecurrent tank area, the customer′s main office located near the tanks, the dock area, and pipelines. Theblast videos are used to analyze rock mass movement, fragmentation and rock projection if any.Thoughtful analysis of the information recovered is continually needed to assist in pattern modification,improving control techniques and limiting the critical blast area. These adjustments are imperative inorder to successfully accomplish the project.
机译:Taboguilla是一个小岛,位于巴拿马运河太平洋入口外10英里处。 2002年,安装了燃料分配设施,以便为通过运河的船只提供燃料。该油库的当前容量相当于1,100,000桶。该地点对船用柴油的需求仍然超出了现有能力,因此,正在进行一项扩建项目,以增加柴油罐的可用空间。为了创造新的空间,总共要挖掘80万立方米。其中总共有40万立方米是玄武岩,需要爆破。要成功执行该项目,需要考虑许多因素。最主要的挑战包括从内陆杂志到岛上爆炸性运输的物流,与客户的协调以避免在船只加油时爆破,设计符合罐体结构峰值粒子速度极限的模式以及避免岩石投射。每个爆炸的关键部分必须得到很好的协调。新的储罐区应位于当前的储罐区附近,并分为两个不同的工作台。爆破将在海拔70米处开始,顶板凳降至35米,最后板凳降至22米。到目前为止,爆炸模式仅限于11.5米的深度和4.0米乘4.0米的模式。当前与建筑物的距离约为90米,但随着项目的推进,爆炸将从与从储罐到停靠区的管道相距20米。为了准备这个关键阶段,需要为每个爆炸完成详细的报告。该报告包括每个井眼的爆炸物数量,时间安排,有关结构的地震仪读数以及爆炸视频。有关结构包括35,000立方米的燃料箱,当前油箱区域上方可能不稳定的工作台,客户位于办公室附近的主要办公室坦克,码头区和管道。爆炸视频可用于分析岩体的运动,破碎和岩石投影(如果有的话)。不断需要对回收的信息进行认真的分析,以帮助进行模式修改,改进控制技术并限制关键爆炸区域。为了成功完成该项目,必须进行这些调整。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号