首页> 外文会议>Asia Pacific Symposium on Safety; 20051102-04; Shaoxing(CN) >Analysis of Foreign Worker Control Effectiveness
【24h】

Analysis of Foreign Worker Control Effectiveness

机译:外籍工人控制有效性分析

获取原文
获取原文并翻译 | 示例

摘要

The purpose of this study is to propose and introduce Accidents Prevention Remedies(APRs) and their priorities especially for Accident Causing Factors(ACFs) drawn by surveying and analyzing how muck foreign workers in Korea have been exposed to dangers at a construction site. At first, as a result of the analysis of the questionnaire which 59 foreign industrial trainees working at construction sites in Seoul-Kyunggi area had responded, 12 ACFs and 11 APRs were analyzed by using the SPSS program. Then, through the Analytic Hierarchy Process(AHP) about the questionnaire from 96 safety and civil engineers who have experienced in managing foreign labor at the construction sites all over the country, the APRs showing their priorities of relative importance are as follows ; 0.160, 0.136, 0.135, 0.099, 0.091, 0.080, 0.079, 0.069, 0.060 and 0.043 from work order & progress to follow up assessment program.
机译:本研究的目的是通过调查和分析韩国的外来工人如何在建筑工地暴露于危险之中,提出并介绍事故预防补救措施(APR)及其优先级,尤其是针对事故致因(ACF)。首先,通过对问卷调查的分析结果,对在首尔京畿地区建筑工地工作的59名外国工业培训生进行了回答,使用SPSS程序对12个ACF和11个APR进行了分析。然后,通过对来自全国各地建筑工地管理外籍劳工的96位安全和土木工程师进行问卷调查的层次分析法(AHP),表明其相对重要性的优先事项如下:从工作订单和进度中获得0.160、0.136、0.135、0.099、0.091、0.080、0.079、0.069、0.060和0.043,以跟进评估计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号