In 2000-2001, the Charter Township of Ypsilanti successfully constructed the fuse-plug emergency spillway in the right embankment beneath the existing roadway. The emergency spillway was constructed in accordance with the FERC mandate to increase the discharge capacity of the existing facility in order to accommodate PMF and extreme flood conditions. The total cost for the auxiliary spillway project was approximately $900,000. This application is unique in that the fuse-plug spillway was installed beneath a county road, which deviates from the FERC requirements regarding fuse-plug spillways. The design and implementation of this auxiliary spillway project was the result of numerous meetings and extensive negotiations with FERC conducted on behalf of the Charter Township of Ypsilanti. This project is a prime example of FERC's willingness to work with the licensee in order to meet FERC requirements and implement a cost-effective solution dictated by site constraints. Construction of the auxiliary spillway was completed in June 2001. Photos 6 and 7 show the completed fuse-plug spillway.
机译:在2000年至2001年间,伊普西兰蒂(Ypsilanti)宪章镇(Charter Township)在现有道路下方的右路堤上成功建造了保险丝塞应急溢洪道。紧急溢洪道是按照FERC的要求建造的,旨在增加现有设施的排污量,以适应​​PMF和极端洪灾条件。辅助溢洪道项目的总成本约为900,000美元。此应用程序的独特之处在于,保险丝插头溢洪道安装在县道下方,这与FERC关于保险丝插头溢洪道的要求有所不同。该辅助溢洪道项目的设计和实施是代表伊普西兰蒂特许镇与FERC进行了无数次会议和广泛谈判的结果。该项目是FERC愿意与被许可方合作以满足FERC要求并实施受场地限制要求的具有成本效益的解决方案的主要示例。辅助溢洪道的建设已于2001年6月完成。照片6和7显示了已完成的保险丝插头溢洪道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号