MONITORING AND REMEDIATION OF AN ACTIVE LANDSLIDE

机译:主动滑坡的监测和修复

获取原文
获取原文并翻译 | 示例

摘要

Ground movements of an ancient landslide accelerated following the construction of a pumped storage power project about thirty years ago. Though at a relatively low movement rate, the active landslide posed hazards not only to the serviceability of transmission structures and roads located within the landslide zone but also to the power plant, reservoir dam and other facilities downstream from the landslide. Long-term monitoring and thorough engineering investigations led to the unequivocal depiction of the scope of the problems and eventual remediation of the landslide. On-site quarrying of rock material in the vicinity of a power plant, two dams and other facilities presented critical challenges to the remediation project. The now almost-completed construction project has not caused interruptions to the normal operation of the power plant. This paper presents historical landslide monitoring data as well as the methodology of the landslide remediation project. Different facets encountered during the investigation, design and construction of the landslide remediation will also be discussed.
机译:大约30年前,随着抽水蓄能电站的建设,古代滑坡的地面运动加速了。尽管处于相对较低的运动速度,但活动滑坡不仅危害滑坡区内的输电结构和道路的可服务性,而且还威胁到发电厂,水库大坝和滑坡下游的其他设施。长期的监测和彻底的工程研究导致对问题范围的明确描述以及对滑坡的最终补救。电厂,两个水坝和其他设施附近的岩石材料的现场采石给整治项目带来了严峻挑战。现已接近完成的建设项目并未对发电厂的正常运行造成干扰。本文介绍了历史滑坡监测数据以及滑坡治理项目的方法。还将讨论在滑坡整治的调查,设计和施工过程中遇到的不同方面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号