The Process of Decommissioning Dams in Ontario

机译:安大略省的水坝退役过程

获取原文
获取原文并翻译 | 示例

摘要

The Ministry of Natural Resources owns and operates over 300 dams in Ontario. Many of those structures were constructed by the logging industry and no longer serve a useful function for flood control. The date, however, none have been decommissioned. The Finlayson and Distress dams are located on the Big East River just west of the Algonquin Park border. Both were originally constructed in the 1930s to serve the interests of the logging industry. Throughout the years, concrete in both structures has deteriorated and, if they were to remain in service, the dams would need major repairs. Engineering studies showed that the complete or partial removal would have no effect on either flood control or low flow augmentation. On this basis, studies were advanced leading to the decision to decommission both dams. This paper describes processes required for the decommissioning of a dam in Ontario, including the technical, economic, social, and environmental issues which must be addressed and accounted for as part of the decision making process.
机译:自然资源部在安大略省拥有并经营着300多个水坝。这些结构中有许多是由伐木业建造的,不再对防洪起到有用的作用。该日期尚未退役。 Finlayson和Distress大坝位于阿冈昆公园边界以西的大东河上。两者最初都是在1930年代建造的,旨在满足伐木业的利益。多年来,两个结构中的混凝土都变质了,如果要继续使用,大坝将需要大修。工程研究表明,全部或部分清除对防洪或低流量增加没有影响。在此基础上,进行了研究,最终决定将这两个水坝退役。本文介绍了安大略省一座大坝退役所需的过程,包括在决策过程中必须解决和考虑的技术,经济,社会和环境问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号