Battle Creek is located in northern California and is a cold water tributary to the Sacramento River. Development of Battle Creek for hydroelectric power generation began in the early 1900s and resulted in the eventual construction of five diversion dams on the North Fork and three diversion dams on the South Fork, along with a complex canal system, to support five high-head, low-volume powerplants. The Battle Creek Hydroelectric Project has been owned and operated by the Pacific Gas and Electric Company (PG&E) since 1919, and is currently licensed by FERC through 2026. Declining salmonid populations in the Sacramento River system, aggravated by ineffective fish ladders, unscreened diversions, and inadequate streamflows, resulted in a multi-agency agreement with PG&E in 1999 to pursue a plan for Battle Creek that would restore and enhance approximately 48 miles of anadromous fish habitat while maintaining the economic viability of the Hydroelectric Project. The Battle Creek Restoration Project includes the installation offish screens and ladders at three diversion dams, the removal of five diversion dams, the construction of two tailrace connectors and a penstock bypass to prevent canal flows from entering the South Fork; and an increase in streamflows by reducing diversions. Contracts for the project work on the North Fork were awarded in 2009 following FERC approval of PG&E's license amendment application, with the remaining work to be contracted as additional approvals and funding become available. This paper will describe the NEPA/CEQA compliance process, final design features, and construction status for the Restoration Project.
机译:巴特尔克里克(Battle Creek)位于加利福尼亚北部,是萨克拉曼多河的冷水支流。巴特尔克里克用于水力发电的开发始于1900年代初期,并最终在北叉上建造了5个导流水坝,在南叉上建造了3个导流水坝,以及一个复杂的运河系统,以支持5个高水头,小批量发电厂。巴特尔克里克水力发电项目自1919年以来一直由太平洋天然气和电力公司(PG&E)拥有和运营,目前已获得美国能源与能源委员会(FERC)的许可,直到2026年。由于流量不足,导致与PG&E于1999年达成了多机构协议,以实施巴特尔克里克计划,该计划将恢复并增强约48英里的无水鱼类栖息地,同时保持水力发电项目的经济可行性。巴特尔克里克恢复项目包括在三个引水坝上安装鱼网和梯子,拆除五个引水坝,建造两个尾水连接器和防止水流进入南叉的压力管道旁路;并通过减少改道来增加流量。在FERC批准PG&E的许可证修订申请后,北叉项目工作的合同于2009年授予,其余工作将在获得更多批准和资金后签订合同。本文将介绍NEPA / CEQA符合性流程,最终设计功能以及修复项目的施工状态。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号