首页> 外文会议>Conference on Connections Between Steel and Concrete Vol.2 Sep 10-12, 2001 Stuttgart, Germany >ANCHORAGE ZONE IN A STEEL-CONCRETE COMPOSITE SLAB WITH UNBONDED TENDONS
【24h】

ANCHORAGE ZONE IN A STEEL-CONCRETE COMPOSITE SLAB WITH UNBONDED TENDONS

机译:钢骨混凝土无粘结筋板的锚固区

获取原文
获取原文并翻译 | 示例

摘要

At VTT Building and Transport, Finland, the composite action between the concrete part and steel sheet of a composite slab with unbonded tendons was investigated by fifteen column tests simulating a load-balanced state. The results from the column tests showed that the transfer lengths were between 350 and 400 mm. They were in agreement with the previous results that the length of an anchorage zone is between the slab thickness (presented for a solid concrete slab) and two times the column side (as for composite columns). The tests showed also that the location of anchors influences on the transfer length of the compressive force to the sheet and on the resistance of the concrete end block.
机译:在芬兰的VTT建筑与运输公司,通过十五个模拟负载平衡状态的柱试验,研究了具有未粘结筋的复合板混凝土构件与钢板之间的复合作用。柱测试的结果表明,转移长度在350至400 mm之间。他们与先前的结果一致,即锚固区的长度在板厚度(对于实心混凝土板而言)与柱侧的两倍(对于复合柱)之间。测试还表明,锚固件的位置会影响压缩力向板的传递长度以及混凝土端块的阻力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号