首页> 外文会议>Conference on Connections Between Steel and Concrete Vol.2 Sep 10-12, 2001 Stuttgart, Germany >COMPOSITE BRIDGE WITH COMPRESSION JOINT. CONNECTION CONCRETE END SLAB TO STEEL GIRDER - DOWELS DIVIDED IN GROUPS
【24h】

COMPOSITE BRIDGE WITH COMPRESSION JOINT. CONNECTION CONCRETE END SLAB TO STEEL GIRDER - DOWELS DIVIDED IN GROUPS

机译:带有压缩接头的复合桥。将混凝土末端平板连接到钢梁-分为组的推土铲

获取原文
获取原文并翻译 | 示例

摘要

A new prestressing system for composite bridges with precast concrete deck slabs is introduced. The prestressing system focuses on low costs and a long lifecycle through the economic use of materials, prefabrication and short construction periods. In the bridge system precast deck slabs on top of a steel girder are prestressed by a hydraulic compression joint. The bridge deck is prestressed before the composite connection has been made. The force is transferred to the steel girder by concrete slabs at both ends of the span. In order to do so, the end slabs are connected to the upper flange of the steel girder with dowels. In this paper the distribution of the prestressing force over the dowels is determined, using a simplified analytic model. The study is part of the author's master thesis at the Technical University of Eindhoven.
机译:介绍了一种用于预制混凝土面板的复合桥的新预应力系统。通过对材料的经济使用,预制和较短的工期,预应力系统着眼于低成本和长寿命。在桥梁系统中,钢梁顶部的预制甲板板由液压压紧接头预应力。在进行复合连接之前,桥面板会受到预应力。跨度两端的混凝土板将力传递到钢梁上。为此,将端板用销钉连接到钢梁的上凸缘。在本文中,使用简化的解析模型确定了预应力在销钉上的分布。该研究是作者在埃因霍温技术大学的硕士论文的一部分。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号