Materials Handling at Olympic Dam Mine―Olympic Dam Aiming for 'Gold'

机译:奥林匹克大坝矿的材料处理-奥运大坝瞄准“金矿”

获取原文
获取原文并翻译 | 示例

摘要

WMC Limited, owner/operator of Olympic Dam, the world's largest underground uranium mine and the fourth largest underground copper mine has now completed an expansion that has been classed as a benchmark in the mining industry. To achieve a production increase from 3.4 to 9.25 Mtpa from an underground mining operation in two years was a major challenge, it was essential to review the overall materials handling system from 'the face to the stockpile'. The challenge was two-fold: a. How to deliver 30 000 tonne of ore per day to the processing plant, from a single underground mine? b. To provide the processing plant with a consistent metallurgical feed. This paper traces the transformation from the old to the new materials handling system at Olympic Dam.
机译:世界最大的地下铀矿和第四大地下铜矿奥林匹克大坝的所有者/运营商WMC Limited现在已经完成了扩建,该扩建已被列为采矿业的基准。为了在两年内通过地下采矿将产量从3.4 Mtpa提高到9.25 Mtpa是一个重大挑战,必须审查从“面到库存”的整个物料搬运系统。挑战是双重的:每天如何从一个地下矿井向加工工厂输送3万吨矿石? b。为加工厂提供一致的冶金原料。本文追溯了奥林匹克大坝从旧材料处理系统到新材料处理系统的转变。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号