摘要

The Rio Salado Town Lake Project includes features that provide recreation andrnaesthetic benefits to the formerly dry Salt River located on the north side of TempernArizona. Two inflatable rubber dams and associated shoreline trails, bike paths, restrnareas and boat ramps provide recreation opportunities to local and out of town visitors.rnThe initial vision of restoring the river channel began at Arizona State University Schoolrnof Architecture in 1966. Feasibility studies began in 1992 and construction occurredrnbetween 1997-99. This $42 million project designed by CH2M HILL includes an 800-footrnlong rubber dam consisting of 4 separate 16-foot high rubber bladders separated byrnreinforced concrete piers. As one of the largest applications of inflatable rubber dams inrnthe United States, this dam sets on a 30 feet thick foundation of reinforced concrete andrnroller compacted concrete. Two miles up the lake a second rubber dam 6-feet high isrnset on a concrete foundation. Town Lake covers approximately 220 acres and isrnpartially surrounded by a soil-bentonite slurry cutoff wall to reduce seepage losses.rnRecovery wells located outside the reservoir return seepage water to the lake.rnOperational since 1999, the lake is functioning as planned. Pedestrian trails supportedrnby retaining walls and soil cement slope protection are landscaped to blend in withrnsurrounding features.rnRepairs to the rubber bladders were conducted by the dam manufacturer inrnSeptember, 2002. These repairs, which required deflating two of the bladders, werernpossible without emptying the lake by using a cofferdam system included in the originalrndesign.
机译:里约热内卢镇湖项目的特色在于为坦佩里亚利桑那州北侧的原盐河提供娱乐和美感。两个充气橡胶坝和相关的海岸线,自行车道,休憩区和船只坡道为当地和外地游客提供了休闲娱乐的机会。修复河道的最初构想始于1966年的亚利桑那州立大学Schoolrnof建筑。可行性研究始于1992年。施工于1997-99年间进行。这个由CH2M HILL设计的耗资4200万美元的项目包括一个800英尺长的橡胶坝,该橡胶坝由4个单独的16英尺高的橡胶囊组成,这些囊由钢筋混凝土墩隔开。作为美国充气式橡胶坝的最大应用之一,该坝建在30英尺厚的钢筋混凝土和压实混凝土基础上。在湖上两英里处,第二个橡胶坝高6英尺,位于混凝土基础上。 Town Lake占地约220英亩,部分被土-膨润土泥浆防渗墙包围,以减少渗漏损失。rn位于储层外部的采油井将渗水返回湖中。rn该湖自1999年投入运营以来,已按计划运行。对由挡土墙和土壤水泥边坡保护所支撑的人行步道进行了景观美化,使其与周围的环境融为一体。由大坝制造商inrnSeptember,2002进行了对橡胶囊的修复。这些修复需要对两个囊进行放气,而无需排空湖。使用原设计中包含的围堰系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号