【24h】

Ultra Deep Water Project

机译:超深水项目

获取原文
获取原文并翻译 | 示例

摘要

The main cost drivers in a total subsea field development are outside FMC KongsbergrnSubsea?s traditional scope of supply. Flowlines/risers, drilling/completion and the productionrnfacility each account for 25 - 30% of the total field development cost.rnThe vehicle to realise lower total cost at both current and future increasing water depths isrntherefore to adopt an overall system approach, with special emphasis on applying subsearnprocessing, and close co-operation and integration with the drilling, pipeline and riserrndisciplines.
机译:整个海底油田开发的主要成本驱动因素不在FMC KongsbergrnSubsea的传统供应范围之外。出油管/立管,钻探/完井和生产设施分别占油田开发总成本的25%至30%。为了在当前和未来不断增加的水深下实现较低的总成本,车辆必须采用整体系统方法,并特别强调运用子深度处理技术,并与钻井,管道和立管学科紧密合作与集成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号