Operational difficulties on an ethylene plant cracked gas compressor train

机译:乙烯装置裂解气压缩机组的运行困难

获取原文
获取原文并翻译 | 示例

摘要

This paper will describe the operational difficulties encountered on the auxiliary systems serving a cracked gas compressor on an ethylene plant at the BP complex at Grangemouth, Scotland. The compressor is a three casing, five-stage machine of 25 MW capacity driven by an extraction/admission/condensing steam turbine. The compressor and turbine, which were both manufactured in Europe, were first commissioned in 1993; they are shown in figure 1. The problems covered will include excessive seal oil make up, excessive sour oil leakage, seal oil/lube oil cross contamination, buffer gas control, the effects of oil contaminated with process gas and problems with the wash water system. The paper will also detail the actions taken both on line and off line to understand the root causes and then to implement the appropriate remedial work.
机译:本文将描述在苏格兰格兰奇茅斯BP联合工厂的乙烯装置上为裂化气压缩机提供服务的辅助系统遇到的操作困难。该压缩机为三壳体,五级机器,容量为25 MW,由抽汽/进气/冷凝汽轮机驱动。压缩机和涡轮机都是在欧洲制造的,于1993年首次投入使用。它们在图1中显示。所涉及的问题将包括过多的密封油补充,过多的酸性油泄漏,密封油/润滑油交叉污染,缓冲气体控制,被工艺气体污染的油的影响以及洗涤水系统的问题。 。本文还将详细介绍在线和离线采取的行动,以了解根本原因,然后实施适当的补救工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号