首页> 外文会议>Engineers Society of Western Pennsylvania Annual International Bridge Conference; 20060612-14; Pittsburgh,PA(US) >Construction Stage and Service Analysis of a Segmental Concrete Arch Bridge Supported by Cables During Construction
【24h】

Construction Stage and Service Analysis of a Segmental Concrete Arch Bridge Supported by Cables During Construction

机译:分段斜拉桥拱桥施工阶段及服务分析。

获取原文
获取原文并翻译 | 示例

摘要

This paper describes the post-tensioning layout, arch moment magnification method, and construction stage analysis techniques used for the design of the Fulton Road Bridge segmental concrete arches. Cables will support several of the arch spans during construction to avoid disturbing the historic stone arch bridge and railroads below the structure.
机译:本文介绍了用于Fulton Road桥分段混凝土拱的设计中的后张式布置,拱矩放大方法和施工阶段分析技术。电缆将在施工过程中支撑多个拱跨,以避免干扰结构下方的历史悠久的石拱桥和铁路。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号