首页> 外文会议>Evironmental contamination and remediation practices at former and present military bases >CURRENT AND FUTURE RESEARCH AND DEVELOPMENT PROJECTS OF THE FEDERAL MINISTRY FOR THE ENVIRONMENT ON CONTAMINATED MILITARY SITES
【24h】

CURRENT AND FUTURE RESEARCH AND DEVELOPMENT PROJECTS OF THE FEDERAL MINISTRY FOR THE ENVIRONMENT ON CONTAMINATED MILITARY SITES

机译:联邦政府污染军工环境的当前和未来研究项目

获取原文
获取原文并翻译 | 示例

摘要

As a result of the political changes in Europe and the concomitant disarmament process, military use of about 50% of what once were 1 million hectares of land used for military purposes has ceased since 1991. This process includes the withdrawal of the Western Group of the former Soviet Forces (WGT) as well as sites of the former GDR's People's Army, the six western Allies, the NATO and the German Federal Armed Forces.
机译:由于欧洲的政治变化和随之而来的裁军进程,自1991年以来,军事用途占曾经用于军事目的的100万公顷土地的约50%停止使用。这一进程包括撤出了前苏联部队(WGT)以及前东德人民军,六个西方盟国,北约和德国联邦武装部队的所在地。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号