首页> 外文会议>Geotechnical engineering: New horizons >Deep excavation construction by top-down method in Zagreb
【24h】

Deep excavation construction by top-down method in Zagreb

机译:萨格勒布自上而下的深基坑施工

获取原文
获取原文并翻译 | 示例

摘要

In the old centra] pan of Zagreb, among a block of buildings, a business facility is being built. The underground structure consists of 5 belowground floors, with maximum excavation depth of around 19 in. For construction of belowground floors the so-called "top - down" method is used. This method is useful to avoid long-term work on the construction of geotechnical anchors and tampering of nearby parcels. Excavation support is ensured by a 24.5 m long reinforced concrete diaphragm wall held by floor slabs of the underground levels. The reinforced concrete diaphragm wall is designed as a permanent structure and presents a vertical cap wall of the underground part of the building. Floor slabs are retained with steel columns, which are founded on drilled shafts Ø120 cm, 12 and 15 m of length.
机译:在萨格勒布(Zagreb)的老中部平底锅中,一幢建筑物之中,正在兴建商务设施。地下结构由5个地下层组成,最大挖掘深度约为19英寸。对于地下层的构造,使用了所谓的“自顶向下”方法。此方法有助于避免长期从事岩土锚的施工和附近地块的篡改。开挖支撑由地下楼层的楼板支撑的24.5 m长的钢筋混凝土隔板墙来确保。钢筋混凝土隔膜墙被设计为永久性结构,并呈现出建筑物地下部分的垂直盖墙。楼板用钢柱固定,钢柱以直径Ø120cm,长度12和15 m的钻孔轴为基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号