首页> 外文会议>European young geotechnical engineers' conference >Deep excavation construction by top-down method in Zagreb
【24h】

Deep excavation construction by top-down method in Zagreb

机译:通过萨格勒布的自上而下方法深度挖掘建设

获取原文

摘要

In the old centra] pan of Zagreb, among a block of buildings, a business facility is being built. The underground structure consists of 5 belowground floors, with maximum excavation depth of around 19 in. For construction of belowground floors the so-called "top - down" method is used. This method is useful to avoid long-term work on the construction of geotechnical anchors and tampering of nearby parcels. Excavation support is ensured by a 24.5 m long reinforced concrete diaphragm wall held by floor slabs of the underground levels. The reinforced concrete diaphragm wall is designed as a permanent structure and presents a vertical cap wall of the underground part of the building. Floor slabs are retained with steel columns, which are founded on drilled shafts ?120 cm, 12 and 15 m of length.
机译:在旧的Centra]萨格勒布,在一块建筑物中,正在建造商业设施。地下结构由5个下面的5个地板组成,最大挖掘深度约为19英寸。用于建造下面地板的结构,所谓的“自上而下”方法。这种方法可用于避免在岩土锚和附近包裹的夯实锚固和篡改的长期工作。由地下水平的地板板持有的24.5米长的混凝土膜片墙确保挖掘支撑。钢筋混凝土隔膜墙设计为永久性结构,呈现建筑物的地下部分的垂直盖壁。地板板材保留钢柱,该钢柱成立在钻井轴上?120厘米,12和15米的长度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号