TMWA Powerhouse Modernization

机译:TMWA强国现代化

获取原文
获取原文并翻译 | 示例

摘要

Truckee Meadows Water Authority (TMWA) has four hydroelectric projects located justrnwest of Reno, Nevada along Interstate 80 as you exit Nevada and start into California.rnThe projects all utilize water from the Truckee River whose headwaters flow from LakernTahoe. The projects were originally built around the turn of the century (20th!) and arerneach in the 2-3 MW range of output.rnFor the past 15 years, TMWA has been progressing on an upgrade plan to modernizernthe projects. The modernization has been driven by events and factors that have beenrnand are continuing to pose an issue for many generation groups. Some of the primaryrndrivers have been: the requirement to separate generation from transmission andrndistribution (all of the projects were previously owned and operated by Sierra PacificrnPower - Nevada Power); failure of antiquated equipment; an aging workforce; thernongoing demand to "do more with less"; as well as a forward-looking view of the need tornmodernize their aging system to make ongoing operation and maintenance easier. Thernupgrading started in 1992, with the help of Phoenix Power Control, Inc. The first plantrnunderwent a complete controls and excitation upgrade. There was a long period of justrnmaintaining but the pace of change has recently accelerated with two other plantsrnundergoing upgrades in the span of about 3 years. The last project a complete electricalrnupgrade including controls, excitation, protection and the medium-voltage subsystem.rnWith regard to the recent projects, Mr. Pat Neilson, the manager of the TMWA projectsrnhas been the driving force with his vision of both the need for updated equipment asrnwell as recognizing that technology has worked its way into many different parts of thernpower plant operations.rnMuch of the current group of operations and maintenance personnel are in the laterrnyears of their careers and most of them will be retiring within the next 5 years.rnCapturing the knowledge of these O&M personnel and passing it on to future operationsrnpersonnel is essential to TMWA's future success. Coupling that working knowledge ofrnthese very old plants with the modern equipment that has been installed has required arngreat deal of adjustment and training for the O&M staff.rnWhere they stand now is that three of their four plants have had substantial electricalrnupgrades, their communications between all of their facilities is now in the modern era,rnand they are much better prepared to bring in new operations and maintenancernpersonnel in the coming years.
机译:特拉基·梅多斯水务局(TMWA)在内华达州里诺市西北80号州际公路上有四个水电项目,当您退出内华达州并进入加利福尼亚州时,这些项目都利用了特拉基河的水,后者的源头来自LakernTahoe。这些项目最初是在世纪之交(20世纪!)建成的,并且其输出功率都在2-3兆瓦范围内。在过去的15年中,TMWA一直在推进对项目进行现代化升级的计划。现代化是由已发生的事件和因素驱动的,并且继续对许多一代人构成问题。其中一些主要驱动因素是:要求将发电与输配电分开(所有项目以前都是由Sierra PacificrnPower-Nevada Power拥有和运营);过时的设备故障;劳动力老龄化;不断的需求“事半功倍”;以及需要对老化系统进行现代化改造以简化正在进行的操作和维护的需求的前瞻性视图。 1992年,在Phoenix Power Control,Inc.的帮助下开始了热能升级。第一台设备进行了完整的控制和励磁升级。进行了很长时间的维护,但是最近三年来,随着另外两家工厂的升级,变化的步伐加快了。最后一个项目是完整的电气升级,包括控制,励磁,保护和中压子系统。对于最近的项目,TMWA项目经理Pat Neilson先生一直是推动力,他认为这两个方面都需要更新设备人员还意识到技术已经在发电厂的许多不同部分中发挥了作用。目前大多数的运维人员都在其职业生涯的后几年,他们中的大多数人将在未来5年内退休。这些运维人员的知识并将其传递给未来的运营人员对于TMWA的未来成功至关重要。将这些非常老的工厂的工作知识与已安装的现代化设备结合起来,需要对运维人员进行大量的调整和培训。他们现在所站在的是,四个工厂中的三个已经进行了大幅的电气升级,所有工厂之间的通信他们的设施现在处于现代时代,并且他们为在未来几年中引入新的运营和维护人员做好了更好的准备。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号