首页> 外文会议>HydroVision 2008 conference technical papers >New Hydropower Development on the Ohio River
【24h】

New Hydropower Development on the Ohio River

机译:俄亥俄河上的新水电开发

获取原文
获取原文并翻译 | 示例

摘要

This paper summarizes the navigation development of the Ohio River, the existing andrnpotential hydropower of the Ohio River, and presents an overview and status of thernongoing development of three new hydropower projects on the Ohio River. AmericanrnMunicipal Power-Ohio, Inc. (AMP-Ohio) is developing the three projects at existing USrnArmy Corps of Engineers (USACE) locks and dams. The projects will develop aboutrn191 MW of renewable energy. The Willow Island Hydroelectric Project is located at thernWillow Island Locks and Dam and will be a two-unit powerhouse with an estimatedrngeneration capacity of 35 MW. The Cannelton Hydroelectric project is located atrnCannelton Locks and Dam and will be a three-unit powerhouse with an estimatedrncapacity of 82 MW. The Smithland Hydroelectric project is located on the Kentuckyrnshore at the Smithland Locks and Dam and will be a three-unit powerhouse with anrnestimated capacity of 74 MW.
机译:本文总结了俄亥俄河的航行发展,俄亥俄河的现有和潜在水力发电,并概述了俄亥俄河上三个新水电项目的纵火开发状况。俄亥俄州俄亥俄公司(AMP-Ohio)正在现有的美国陆军工程兵团(USACE)船闸和水坝中开发这三个项目。这些项目将开发约191兆瓦的可再生能源。柳岛水力发电项目位于威洛岛锁和水坝,将成为两台机组,发电量估计为35兆瓦。 Cannelton水力发电项目位于Cannelton Locks和大坝,将是一个三单元发电站,估计装机容量为82 MW。 Smithland水力发电项目位于Smithland Locks和Dam的肯塔基海岸,将是一个三单元发电站,预计发电量为74 MW。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号