首页> 外文会议>HydroVision 2008 conference technical papers >Turbine Refurbishment of High Falls Power Dam
【24h】

Turbine Refurbishment of High Falls Power Dam

机译:高瀑布发电站的涡轮机翻新

获取原文
获取原文并翻译 | 示例

摘要

Hydraulic turbine refurbishment has gained importance to the hydraulic manufacturer asrnit becomes a growing market and an economical way for the customer to obtain modernrnperformance level at a low cost. Unfortunately, turbine refurbishment is not discussedrnas often as the high profile and impressive new dam projects. Each turbinernrefurbishment project is unique and comes with a large number of unexpectedrnchallenges. For this reason, to be able to bring this kind of project to completion whilernmaintaining high quality and low cost, refurbishment project requires experience andrningenuity of a highly interactive team. This paper will present an overview of thernrefurbishment of the hydraulic turbines at the High Falls power dam as performed by GErnHydro Montreal.
机译:水力涡轮机的翻新对水力制造商而言已变得越来越重要,因为水力涡轮机成为日益增长的市场,也是客户以低成本获得现代性能水平的经济途径。不幸的是,涡轮机翻新并没有作为高调和令人印象深刻的新大坝项目而经常讨论。每个涡轮机翻新项目都是独特的,并带有大量意想不到的挑战。因此,为了能够在保持高质量和低成本的情况下完成这类项目,翻新项目需要高度互动的团队的经验和能力。本文将概述GErnHydro Montreal进行的High Falls发电大坝水轮机的翻新工程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号