首页> 外文会议>Innovate integrate amp; invigorate >Measurements for the Safety and Mission Assurance of the International Space Station
【24h】

Measurements for the Safety and Mission Assurance of the International Space Station

机译:国际空间站安全和飞行任务保障的措施

获取原文
获取原文并翻译 | 示例

摘要

Effective and efficient programmatic decisions are required throughout the design, development, and operation of the International Space Station (ISS), which involves sixteen countries, over one million pounds of flight hardware, and an on-orbit assembly process spanning six years. Paramount to the success of the ISS, are the safety and mission assurance (S&MA) aspects of the program. Various S&MA products, such as critical items (CILs), safety nonconformances, and problem reports, all provide an individual assessment of the program's risk throughout the design, development, and operation phases of the ISS life cycle. However, until recently, no method existed for measuring the overall S&MA risk of NASA programs. The NASA International Space Station Program's Safety and Mission Assurance/Program Risk Office (S&MA/PR) has developed such a metric.
机译:在国际空间站(ISS)的整个设计,开发和运营过程中,需要做出有效而高效的方案决策,该过程涉及16个国家/地区,超过一百万磅的飞行硬件以及跨越六年的在轨组装过程。该计划的安全性和任务保证(S&MA)方面是ISS成功的最重要因素。各种S&MA产品,例如关键项目(CIL),安全不合格品和问题报告,都可以在ISS生命周期的整个设计,开发和运营阶段提供对该计划风险的单独评估。但是,直到最近,还没有一种方法可以衡量NASA计划的总体S&MA风险。 NASA国际空间站计划的安全和任务保证/计划风险办公室(S&MA / PR)已制定了这样一个指标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号