Hwamyung Bridge over the Nakdong River is the largest cast-in place concrete cable stayed bridgernin Korea with a center span of 270m and side span of 115m each. The stay-cables are spaced atrn6.8m along the box girder and arranged in a semi-harp configuration. They are anchored at centralrnsingle towers with vertical leg extending 65m above the deck. With the closure of center span inrnNovember 2010, the erection of cable and box girder, which is a major portion of the bridgernconstruction, was completed.
机译:那空河上的华明大桥是韩国最大的现浇混凝土斜拉桥,中心跨距为270m,侧跨均为115m。撑索沿箱梁的间距为6.8m,并以半竖琴的形式布置。它们被固定在中央单塔上,垂直腿在甲板上方延伸65m。随着2010年11月中心跨度的关闭,作为桥梁施工主要部分的电缆和箱形梁的安装完成了。