首页> 外文会议>Innovative infrastructures - toward human urbanism : Report >The Gravel bedding for a foundation of the Busan-Geoje Immersed Tunnel
【24h】

The Gravel bedding for a foundation of the Busan-Geoje Immersed Tunnel

机译:釜山-巨济浸没式隧道基础的碎石垫层

获取原文
获取原文并翻译 | 示例

摘要

The GK immersed tunnel as a part of the Busan-Geoje Fixed Link Project, introduced the immersedrntunnel method into Korea for the first time. This challenging project completed in 2010 open a newrnera to link oceans of the world with advanced technology and safety for future use. One of the mostrnchallenging construction item was a Screeded gravel bedding for the Immersed tunnel foundationrndue to very severe site condition. In order to overcome the severe conditon developed new accuraternequipment. The gravel bedding was successfully done within the given tolerance have been verifiedrnby survey in the tunnel. We hope the techniques learned from the Busan-Geoje Fixed Link Projectrncan be applied to further projects in the near future.
机译:GK沉管隧道是釜山-巨济固定连接项目的一部分,首次将沉管隧道方法引入韩国。这个具有挑战性的项目于2010年完成,它开辟了一条新路,将世界海洋与先进技术和安全性联系起来,以备将来使用。最具挑战性的建筑项目之一是沉浸式隧道基础的平整砂砾垫层,原因是工地条件非常恶劣。为了克服严峻的条件开发了新的精确设备。砂砾层理已在给定的公差范围内成功完成,已在隧道中进行了勘测。我们希望从釜山-吉奥固定路线项目中学到的技术可以在不久的将来应用于更多项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号