首页> 外文会议>International Geoscience and Remote Sensing Symposium >Development of level 1b calibration and validation readiness, implementation and management plans for GOES-R
【24h】

Development of level 1b calibration and validation readiness, implementation and management plans for GOES-R

机译:为GOES-R制定1b级校准和验证准备,实施和管理计划

获取原文

摘要

A complement of Readiness, Implementation and Management Plans (RIMPs) to facilitate management of post-launch product test activities for the official Geostationary Operational Environmental Satellite (GOES-R) Level 1b (L1b) products have been developed and documented. Separate plans have been created for each of the GOES-R sensors including: the Advanced Baseline Imager (ABI), the Extreme ultraviolet and X-ray Irradiance Sensors (EXIS), Geostationary Lightning Mapper (GLM), GOES-R Magnetometer (MAG), the Space Environment In-Situ Suite (SEISS), and the Solar Ultraviolet Imager (SUVI). The GOES-R program has implemented these RIMPs in order to address the full scope of Cal/Val activities required for a successful demonstration of GOES-R L1b data product quality throughout the three validation stages: Beta, Provisional and Full Validation. For each product maturity level, the RIMPs include specific performance criteria and required artifacts that provide evidence a given validation stage has been reached, the timing when each stage will be complete, a description of every applicable Post-Launch Product Test (PLPT), roles and responsibilities of personnel, upstream dependencies, and analysis methods and tools to be employed during validation. Instrument level Post-Launch Tests (PLTs) are also referenced and apply primarily to functional check-out of the instruments.
机译:已经开发并记录了准备,实施和管理计划(RIMP)的补充,以便利管理官方对地静止运行环境卫星(GOES-R)1b(L1b)产品的发布后产品测试活动。已为每个GOES-R传感器创建了单独的计划,包括:高级基线成像仪(ABI),极紫外和X射线辐照度传感器(EXIS),对地静止闪电测绘仪(GLM),GOES-R磁强计(MAG) ,太空环境现场套件(SEISS)和太阳紫外线成像仪(SUVI)。 GOES-R计划已实施了这些RIMP,以解决在三个验证阶段(Beta,临时和全面验证)成功演示GOES-R L1b数据产品质量所需的全部Cal / Val活动。对于每个产品成熟度级别,RIMP都包含特定的性能标准和所需的工件,以提供证据证明已达到给定的验证阶段,完成每个阶段的时间,每个适用的后期产品测试(PLPT)的描述,角色人员的职责,上游依存关系以及验证期间要使用的分析方法和工具。还引用了仪器级别的启动后测试(PLT),这些测试主要适用于仪器的功能检出。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号