首页> 外文会议>International offshore and polar engineering conference;ISOPE-2009 >Detailed Design and Construction of the Hull of an FPSO (Floating, Production, Storage, and Off-loading Unit)
【24h】

Detailed Design and Construction of the Hull of an FPSO (Floating, Production, Storage, and Off-loading Unit)

机译:FPSO的船体(浮动,生产,存储和卸货单元)的详细设计和构造

获取原文

摘要

This study presents the ways and means of detailed design andconstruction of an FPSO installed in the AKPO field, offshore Nigeriawith a close attention on the offshore market in deepwaterdevelopments.First, we explain the overall process of the on-going AKPO FPSO fromdetailed design to construction and lessons learned from AKPO FPSO,contributing to successful design and construction of future FPSO's.The design and construction of an FPSO (Floating, Production, Storage,and Off-loading unit) is divided into two parts: one for the hull systemand the other for the topside system. The FEED (Front End EngineeringDesign) and specification on the FPSO commenced with the DBR(Design Basis Report). This resulted from a feasibility study on theexploration of the specific field in order to meet the marketrequirements for stabilized oil. We performed a detailed design of thehull system of AKPO FPSO based on the FEED and coordinated theoverall FPSO designs of the hull and the topside systems, which wereperformed by other contractors. After finishing the detailed design ofthe FPSO, we performed the construction and integration of the hulland the topside.Second, we describe some problems and their solutions of the detaileddesign and construction of the AKPO FPSO. Through this study,readers will be able to learn the detailed design and construction of theFPSO.
机译:这项研究提出了详细设计和建造安装在尼日利亚海上AKPO油田的FPSO的方式方法,并密切关注深水开发中的海上市场。首先,我们解释了正在进行的AKPO FPSO从详细设计到施工的整个过程以及从AKPO FPSO汲取的经验教训,有助于未来FPSO的成功设计和建造。FPSO的设计和建造(浮动,生产,存储和卸货单元)分为两部分:一个用于船体系统,另一个用于船体系统。用于顶侧系统。 FPSO上的FEED(前端工程设计)和规范始于DBR(设计基础报告)。这是由于对特定领域的勘探进行了可行性研究,从而满足了稳定油的市场需求。我们基于FEED对AKPO FPSO的船体系统进行了详细设计,并协调了由其他承包商执行的船体和顶部系统的整体FPSO设计。在完成FPSO的详细设计之后,我们在顶部进行了hulland的构建和集成。其次,我们描述了AKPO FPSO的详细设计和构建中的一些问题及其解决方案。通过这项研究,读者将能够学习FPSO的详细设计和构造。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号