首页> 外文会议>International Conference on Dam Safety Management(2008水库大坝安全管理国际研讨会) >Analyses Information on Observing Deformation of Yellow River Wanjiazai Main Dam
【24h】

Analyses Information on Observing Deformation of Yellow River Wanjiazai Main Dam

机译:黄河万家寨主坝变形观测资料分析。

获取原文

摘要

This paper analyses information on observing external deformation of Wanjiazai main dam, and the conclusion holds that operation status for this dam is normal at present,variation rule of deformation on dam basically accord well with design theory of concrete gravity dam and different variation rules for such same kind gravity dams, the status of the interlayer shear zone of dam foundation is stable. But the continuity of horizontal displace-ment at crest is bad, the integrality and precision of 1#, 7# vertical group are worse too. It's suggested that the problem for vertical observation on 1# dam section.
机译:本文通过对万家寨主坝外部变形观测资料的分析,得出结论,目前该坝的运行状态是正常的,坝体变形的变化规律与混凝土重力坝的设计理论基本吻合,为此,应采用不同的变化规律。同类型重力坝,坝基层间剪切带状态稳定。但波峰水平位移的连续性较差,1#,7#垂直群的整体性和精度也较差。建议在1#坝段进行竖向观测。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号