Embedding Continuous Commissioning~R in an Energy Efficiency Retrofit Program

机译:将持续调试〜R嵌入到能效改造计划中

获取原文
获取原文并翻译 | 示例

摘要

his paper presents a case study where Continuous Commissioning~R(CC~R) , a process that optimizes the HVAC system operation and controls to reduce the building energy consumption and improve comfort, was embedded as one Energy Cost Reduction Measure (ECRM) in a $2.7 million energy efficiency program. The program covers four campuses and two administrative office buildings of a community college district, with a total conditioned area of 2.35 million square feet. Cumulative cost savings of over $1.7 million have been achieved since the start of the program in mid-2002. Savings as a direct result of the CC~R efforts account for almost 2/3 of the total cost reduction. This paper discusses major commissioning activities for the central plants and building heating, ventilation, and air conditioning (HVAC) systems, as well as how deferred maintenance issues, key to the success of any commissioning project, were addressed and adminstered by the CC~R engineer.
机译:他的论文提供了一个案例研究,其中将持续优化调试(R〜CC(R),该过程优化了HVAC系统的运行和控制以降低建筑能耗和改善舒适度)作为一项降低能耗的措施(ECRM)嵌入了一个案例中。 270万美元的能源效率计划。该计划涵盖社区大学区的四个校园和两个行政办公大楼,总空调面积为235万平方英尺。自该方案于2002年中开始实施以来,已累计节省了170万美元以上的费用。 CC〜R工作的直接结果是节省的费用几乎占总成本减少的2/3。本文讨论了中央工厂和建筑物供暖,通风和空调(HVAC)系统的主要调试活动,以及CC〜R如何解决和管理延迟维护问题,这是任何调试项目成功的关键工程师。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号