Using Theory of Constraint for Information System Project Risk Management in the Multiple Project Situations

机译:约束理论在多种项目情况下的信息系统项目风险管理

获取原文
获取原文并翻译 | 示例

摘要

The direct application of Theory of Constraints (TOC) to information system (IS) project management, known as IS project risk problem in the multiple project situations, has recently emerged as one of the most popular approaches to project management. The object of this paper is to highlight interde-pendencies in the multiple IS project situations and to introduce TOC that enables the systematic identification of interdependen-cies and relations. Following an overview of the current approaches to multiple project situations, the basic items of risk in IS project development and the risk in the multiple project situations were analyzed. On the basis of that, the TOC approach was introduced into IS project risk management. After identifying and quantifying risks, 10 top risks were ranked and the risk reduction strategies were proposed accordingly.
机译:约束理论(TOC)在信息系统(IS)项目管理中的直接应用(在多个项目情况下被称为IS项目风险问题),最近已成为最受欢迎的项目管理方法之一。本文的目的是强调在多个IS项目情况下的相互依存关系,并介绍TOC,该TOC能够系统地确定相互依存关系。在概述了当前针对多个项目情况的方法之后,分析了IS项目开发中的基本风险项目以及多个项目情况中的风险。在此基础上,TOC方法被引入IS项目风险管理中。在识别和量化风险之后,对10个主要风险进行了排名,并据此提出了降低风险的策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号