首页> 外文会议>International Conference on Probabilistic Safety Assessment and Management(PSAM7-ESREL'04) v.5; 20040614-20040618; Berlin; DE >Integration of LERF Calculation Capability into the Second Generation of Taiwan's NPP Risk Monitor
【24h】

Integration of LERF Calculation Capability into the Second Generation of Taiwan's NPP Risk Monitor

机译:LERF计算能力整合到台湾第二代NPP风险监控器中

获取原文
获取原文并翻译 | 示例

摘要

With the capability of performing CDF and LERF calculations, the TIRM-2 becomes a very helpful tool in monitoring the risk of different plant states and provides associated information directly for risk-informed applications. The calculation speed and the accuracy of results are significantly enhanced in the TIRM-2. Taiwan's NPP staffs and managers have recognized that the TIRM-2's associated techniques can precisely capture the plant risks and can serve as a better management resource. Currently, the TIRM-2 on power and on refueling outages have been released to all of the three operating NPPs for their usage. This powerful risk monitor, TIRM-2, has replaced TIRM to provide the basis of risk-informed applications since June of 2003.
机译:TIRM-2具有执行CDF和LERF计算的能力,成为监视不同工厂状态风险的非常有用的工具,并直接为风险告知应用提供相关信息。 TIRM-2大大提高了计算速度和结果的准确性。台湾的NPP员工和管理人员已经认识到TIRM-2的相关技术可以精确地捕获工厂风险,并可以作为更好的管理资源。目前,已将有关电力和加油中断的TIRM-2发布给所有三个运行的NPP进行使用。自2003年6月以来,这款功能强大的风险监控器TIRM-2取代了TIRM,为基于风险的应用提供了基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号