首页> 外文会议>International Conference on Soil Mechanics and Geotechnical Engineering(16 ICSMGE) vol.3; 2005; Osaka(JP) >Geotechnical analyses of Taipei International Financial Center (Taipei 101) Construction Project
【24h】

Geotechnical analyses of Taipei International Financial Center (Taipei 101) Construction Project

机译:台北国际金融中心(台北101)建设项目岩土分析

获取原文
获取原文并翻译 | 示例

摘要

This paper presents the results of series of numerical analyses using various simulation schemes to investigate the behavior of piled raft foundation, the possible effect of micro-pile installation on reducing ground movements and the creep deformation of deep excavation in TIFC (raipei Interaational Financial Center) Construction Project (or Taipei 101 project). The project possesses a large deep excavation area of 152.2mx159.14w, 5-story basement of 21.7m deep and 101-story steel reinforced concrete tower building of 508m high. In addition to the pile loading tests in the TIFC jobsite which consists of 3 compression piles and 2 extension piles, there totally 128 boreholes were drilled for sampling and a series of high quality laboratory tests and field tests were conducted to determine the physical and mechanical properties of soil stratum. Moreover, a well-organized instrumentation system was also established to monitor various ground responses and structural performances during the excavation.
机译:本文介绍了使用各种模拟方案进行的一系列数值分析的结果,以研究桩筏基础的性能,安装微型桩对减少地面运动以及TIFC(雷柏国际金融中心)深基坑蠕变变形的可能影响。建设项目(或台北101项目)。该项目具有152.2mx159.14w的大型深基坑开挖面积,51.7层深的2层地下室和508m高的101层钢筋混凝土塔楼。除了在由3个压缩桩和2个延伸桩组成的TIFC工作现场进行桩载荷测试外,总共钻了128个钻孔以进行采样,并进行了一系列高质量的实验室测试和现场测试,以确定物理和机械性能地层。此外,还建立了井井有条的仪器系统,以监测挖掘过程中的各种地面响应和结构性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号