首页> 外文会议>International Workshop on Competitive Bidding and Auctions; 20041203-04; Wuhan(CN) >Defects and Merits of Base Price in Construction Bidding Evaluation
【24h】

Defects and Merits of Base Price in Construction Bidding Evaluation

机译:建筑工程评标中底价的优缺点

获取原文
获取原文并翻译 | 示例

摘要

Construction clients are increasingly calling for scientific and rational bid evaluation methods to select the most competitive contractors to realize their construction objects. In China, bid evaluation methods are normally the comprehensive methods with a fixed base price or amended base price, of which an important consideration is the construction cost estimated in advance by the clients. Evaluation criteria are normally set out in the bidding documents used as the basis for determining who is the most successful contractor. And then, bid evaluation without base price is introduced which is only used by a few construction projects and still on the study primarily in China. Their merits and defects are discussed respectively and to illustrate the difference among them, three examples are introduced in this paper.
机译:施工客户越来越多地要求科学合理的投标评估方法,以选择最具竞争力的承包商来实现其施工目标。在中国,投标评估法通常是采用固定基准价或修正基准价的综合方法,其中重要的考虑因素是客户预先估算的建筑成本。评估标准通常在招标文件中列出,用作确定谁是最成功的承包商的基础。然后,引入了没有基准价的投标评估,该评估仅在少数建设项目中使用,并且仍主要在中国进行研究。分别讨论了它们的优缺点,并说明了它们之间的区别,并介绍了三个示例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号