【24h】

Consideration on Dredging in Narrow Reach of Lower Yellow River

机译:黄河下游疏arrow的思考。

获取原文
获取原文并翻译 | 示例

摘要

The startup project for river dredging at the Yellow River estuary implemented in June of 1998 has not played a good role later because some people hold different opinions in respect of its necessity, feasibility, expected results and assessment criteria, etc. Proceeding with the analyses on sedimentation change, existing problems and improvement measures of the lower river course, the necessity of river dredging is discussed in the paper , and its feasibility in theoretical development, engineering practice, construction technique and sediment disposal is stated. In accordance with the inspiration from the project, the concepts of " dredging" and " sedimentation reduction" are distinguished so that the target and assessment criteria for river dredging are advanced, as well as a standpoint of "keep on dredging as long as the YR is running".
机译:1998年6月在黄河口进行的河道疏startup启动工程起不到很好的作用,因为有人对它的必要性,可行性,预期结果和评估标准等持有不同的意见。论述了河道下游的泥沙淤积变化,存在的问题和改善措施,以及河道疏dr的必要性,并阐述了其在理论发展,工程实践,施工工艺和泥沙处置方面的可行性。根据项目的启发,区分了“疏“”和“减少泥沙”的概念,从而提高了河流疏ed的目标和评估标准,并提出了“只要YR就保持疏dr”的立场。在跑”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号