EAST SIDE ACCESS MANHATTAN: A STUDY IN COOPERATION

机译:东侧接入曼哈顿:合作研究

获取原文

摘要

The East Side Access Project will bring Long Island Rail Road service to the East Side of Manhattan in New York City. CM009 consists principally of running tunnel construction by TBM, but includes two ancillary structures. CM019 principally consists of cavern and ancillary structure excavation, but includes some tunneling. The Joint Venture of Dragados-Judlau (DJ) was awarded both contracts. MTA Capital Construction (MTA CC) and DJ looked for ways to optimize construction to accelerate schedule by redesigning certain project elements to maximize TBM and roadheader use and reduce use of blasting. Redesign was performed as a cooperative effort by MTA CC, DJ, and the General Engineering Consultant (GEC), a consortium of A-E firms. This paper discusses proposals developed by DJ to maximize TBM and roadheader use, MTA CC coordination and support of the cooperative fast-track design process, geotechnical and structural design activity required to implement the proposals, construction logistics, risk mitigation, and experience in excavating and supporting the redesigned openings through mid-January 2011.
机译:东侧接入项目将为纽约市曼哈顿东侧带来长岛铁路服务。 CM009主要包括通过TBM运行隧道结构,但包括两个辅助结构。 CM019主要包括洞穴和辅助结构挖掘,而是包括一些隧道。 Dragados-Judlau(DJ)的合资企业被授予两份合同。 MTA Capital Construction(MTA CC)和DJ通过重新设计某些项目元素来优化施工以加速时间表,以最大限度地提高TBM和路标使用和减少爆破的使用。重新设计是由MTA CC,DJ和一般工程顾问(GEC)是A-E公司的一般工程顾问的合作努力。本文讨论了DJ开发的提案,以最大限度地提高TBM和陆路主机使用,MTA CC协调和支持合作的快速轨道设计过程,实现提案,建筑物流,风险缓解和挖掘经验所需的岩土性和结构设计活动通过2011年1月中旬支持重新设计的开口。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号