APPROACH FOR A COST-EFFECTIVE VENTILATION DURING CONSTRUCTION OF A HIGH-SPEED RAILWAY TUNNEL

机译:高速铁路隧道建设期间具有成本效益通气的方法

获取原文

摘要

As part of a new high-speed railway line in Germany, a twin-tube tunnel with a length of 8,200 m (26,900 ft) is designed and will be constructed adopting the drill and blast method. The two parallel tunnel tubes feature cross passages every 500 m (1,640 ft) and will be built concurrently with the excavations, starting from five different locations. Due to the fact that the excavation works will all take place at the same time, a circulating air system for the supply of fresh air will be used during the construction phase. This innovative method was found to lower the equipment installation costs and to minimize the electric power consumption during construction.
机译:作为德国新型高速铁路线的一部分,设计了一条长度为8,200米(26,900英尺)的双管隧道,并将构建采用钻头和爆炸法。两个平行的隧道管通过每500米(1,640英尺)(1,640英尺)特征交叉通道,并将与挖掘同时建造,从五个不同的位置开始。由于挖掘工程将同时发生挖掘工作,在施工阶段将使用用于供应新鲜空气的循环空气系统。发现这种创新方法降低了设备安装成本,并最大限度地减少了施工期间的电力消耗。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号