首页> 外文会议>Symposium on nuclear data >2.3 The present status of medical application of particle accelerator started construction of new medically dedicated proton accelerator facility in tsukuba
【24h】

2.3 The present status of medical application of particle accelerator started construction of new medically dedicated proton accelerator facility in tsukuba

机译:2.3粒子加速器医学应用现状开始在筑波的新医学专用质子加速器设施建设

获取原文

摘要

A new facility of PMRC starts the construction in the neighborhood of Tsukuba university hospital, in order to establish technical skill for practical use in the cancer treatment and to grope for new skill. The facility has a linac injection system, a compact ynchrotron, two rotating gantry rooms and two fixed horizonal beam lines. The outine of the design arranged for the facility is reviewed. As one of the important technique for the treatment, investigation into target adjusting accruacy in respiration-gated proton irradiation is presented.
机译:PMRC的新设施开始在筑波大学医院附近的建设,以便建立癌症治疗中实际应用的技术技能,并掌握新技能。 该设施具有LINAC注射系统,紧凑型YNCHROTRON,两个旋转龙门房和两个固定的地平线线。 综述了为设施排列的设计的潜在。 作为治疗的重要技术之一,介绍了对呼吸门控辐射中的靶标调节的靶标的研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号