Blast vibration and impact sound control, measurement and documentation during two large-scale tunnelling projects

机译:两种大型隧道工程中的爆炸振动和冲击声控制,测量和文档

获取原文

摘要

The paper presents the vibration and sound emission measurement campaigns carried out in 2007 in preparation for the Ceneri-Basistunnel construction. We also present the vibration measurement campaign conducted during the construction of the Zimmerberg-Basistunnel. Both tunnels form an integral part of the Swiss Federal Railway Company Neue Eisenbahn Alpentransversale project (NEAT). This strategic project comprised the construction of several new tunnels. Its aim is the improvement of the existing infrastructure. The improved infrastructure will be able to accommodate a larger volume of railway traffic that is also crossing the Alps at higher speeds. The construction of the Ceneri-Basistunnel commenced in 2006. Both the Zimmerberg-Basistunnel and the Ceneri-Basistunnel are located underneath densely populated areas. Therefore, noise and vibration emissions have to be kept to a minimum and must not exceed applicable codes of practice. In order to identify the most appropriate blasting strategy for the yet to be constructed Ceneri-Basistunnel, blasting trials were conducted. The paper presents the findings of these trials and identifies ways to reduce both noise and vibration emissions from blasting. The construction of the first phase of the Zimmerberg-Basistunnel took place between 1999 and 2003. While the first phase is already in operation, the construction of the second phase has been postponed (commencement originally due in 2007). The Zimmerberg-Basistunnel connects the outskirts of Zurich with the city centre. As the tunnel site was not located close to the surface near populated grounds, no special measures were needed to reduce the noise emissions from blasting. However during the construction of the tunnel, the vibration emissions from blasting were monitored on more than 50 locations on the surface. The paper presents the analysis of some of the data. An emphasis is placed on the appropriate synopsis and presentation of data for documentation purposes.
机译:本文介绍了2007年开展的振动和声音排放测量运动,以准备CENERI-BASISTUNNEL施工。我们还提出了在Zimmerberg-Basistunnel施工期间进行的振动测量运动。两个隧道都形成了瑞士联邦铁路公司Neue Eisenbahn Alpentransversale项目(整洁)的一个组成部分。该战略项目包括若干新隧道的建设。其目的是改善现有基础设施。改进的基础设施将能够适应更大量的铁路交通,该交通也在更高的速度下穿过阿尔卑斯山脉。 2006年的Ceneri-Basistunnel的建设开始。Zimmerberg-Basistunnel和Ceneri-Basistunnel都位于浓密的填充区域下方。因此,噪音和振动排放必须保持最小,并且不得超过适用的实践守则。为了识别尚未建造的CENERI-BASISTUNNEL的最合适的爆破策略,进行了爆破试验。本文提出了这些试验的调查结果,并确定了减少爆破噪声和振动排放的方法。 Zimmerberg-Basistunnel的第一阶段的构建在1999年和2003年之间发生。虽然第一阶段已经在运作,第二阶段的建设被推迟了(2007年最初到期的开始)。 Zimmerberg-Basistunnel连接苏黎世的郊区与市中心。由于隧道部位未靠近填充地的地面,因此不需要特殊措施来减少爆破的噪音排放。然而,在隧道的构造过程中,在表面上的50多个位置监测爆破的振动排放。本文提出了一些数据的分析。将重点放在适当的概要和呈现数据的介绍目的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号