Hokuriku Electric Power Co. is currently constructing Shika Nuclear Power Plant Unit No. 2 in order to start commercial operation in March 2006. The intake and discharge water will be via undersea tunnel, as well as Unit No. 1, in order to minimize environmental impact. Various techniques such as shield tunneling, NATM and semi-shield method was adapted to excavate large diameter rock tunnel under high water pressure. This article deals with such various techniques and achievements.
机译:北陆电力公司目前正在建设Shika核电站2号机组,以便于2006年3月开始商业运行。进水和排水水将通过1号机组以及海底隧道进行,以最大程度地减少环境污染。影响。盾构法,NATM法和半盾法等各种技术都适用于在高水压下开挖大直径的岩洞。本文讨论了这样的各种技术和成就。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号