首页> 外文会议>Waste management symposium >DEVELOPING A DECISION LOGIC FOR THE YUCCA MOUNTAIN TRANSPORTATION PROGRAM
【24h】

DEVELOPING A DECISION LOGIC FOR THE YUCCA MOUNTAIN TRANSPORTATION PROGRAM

机译:为Yucca Mountain运输计划制定决策逻辑

获取原文

摘要

One of the key strategic documents for the Waste Isolation Pilot Plant(WIPP)was the development of the WIPP Disposal Decision Plan.This document consisted of a high level summary of the key milestones and logic ties for the five major program elements: Regulatory/Technical Processes;Stakeholders/Oversight;Experimental Programs and Performance Assessment;Waste Characterization,Certification,and Inventory;and,Operations. On July 23,2002,the President signed a joint resolution clearing the way for the submission of a license application to the Nuclear Regulatory Commission to open and operate Yucca Mountain as a geologic repository for the disposal of high-level waste and spent nuclear fuel.To support the effort of licensing,building,and operating the repository,and developing the transportation system needed to accept,ship and dispose of these materials,the Office of Civilian Radioactive Waste Management began developing an integrated schedule along the lines of the WIPP Disposal Decision Plan.This Draft Decision Plan,currently being developed,identifies the major activities,milestones,and decisions necessary to initiate repository operations in 2010, and the transportation portion of this plan is a key element.The transportation portion forms the basis for the decision timeline and depicts the program’s critical path,key milestones,inter- relationship with the repository,the utilities and other U.S.Department of Energy sites.It includes information on overall planning milestones,such as development of strategic plans, operational plans and campaign plans;cask acquisition;develop of transportation facilities,if needed;development of Nevada infrastructure,if needed.Key transportation assumptions have also been included in the Draft Decision Plan.A Draft Decision Plan Milestone Dictionary has been developed to supplement this integrated program schedule.
机译:一个用于废物隔离试验厂(WIPP)的关键战略文件是WIPP处理决定Plan.This开发文档组成的重要里程碑和逻辑关系的五个主要程序元素的一个高度概括的:管理/技术流程;利益相关者/监督;实验方案和绩效考核;废料表征,认证和清单;以及运营。七月23,2002,总统签署了一项联合决议扫清提交许可证申请到核管理委员会来打开和运行尤卡山作为地质资料库处置高放废物和废核燃料的方法。为了支持牌,建设和运行库,并发展到接受,船舶以及这些材料的处理所需要的交通运输系统的努力,民用放射性废物管理办公室开始开发沿WIPP处理决定的线的集成调度Plan.This决定草案计划,目前正在开发中,列出了主要的活动,里程碑和决策需要在2010年发起信息库的操作,而这个计划的运输部分是一个关键element.The运输部形式的决策时间表的基础并描述了该项目的关键路径,关键里程碑,与仓库间的关系,公用事业及其他USDE能源sites.It的partment包括总体规划阶段性目标,如战略规划,经营计划和活动计划的制定信息;木桶采集;开发的交通设施,如果需要的话,内华达州的基础设施发展,如果needed.Key运输的假设也有被列入该决定草案Plan.A决定草案计划里程碑字典已经发展到补充这一综合方案的时间表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号