首页> 外文会议>International conference on information computing and applications >Intensified extracting gas and rapidly diminishing outburst risk using deep-hole presplitting blast technology before opening coal seam in shaft influenced by fault
【24h】

Intensified extracting gas and rapidly diminishing outburst risk using deep-hole presplitting blast technology before opening coal seam in shaft influenced by fault

机译:在受到断层影响的煤层打开煤层之前,采用深孔预裂爆破技术强化抽采瓦斯并迅速减少突出风险

获取原文

摘要

Deep-hole presplitting blast technology is an effective method to intensively increase the permeability of coal seam and high-efficiency extract gas. Aimed at the drivage shaft working place of opening No. 13-1 Coal seam influenced by fault in Panyi Coal Mine, this paper comprehensively took advantage of the technology of deep-hole presplitting blast and intensified increasing permeability, the technology of reinforcing coal body using metal skeleton, as well as the technology damming and extracting gas of outside of metal skeleton, diminished the outburst risk only after 18 days, and got the purpose of rapidly diminishing outburst risk. And this provided an effective solution of rapidly diminishing outburst risk and safety opening coal seam for similar conditions.
机译:深孔预裂爆破技术是有效提高煤层和高效抽采瓦斯渗透率的有效方法。针对番yi煤矿13-1号煤层洞口受断层影响的掘进井工作地点,综合利用深孔预裂爆破,加大渗透率技术,利用煤层补强煤层的技术。金属骨架以及金属骨架外部的筑坝和抽气技术,仅在18天后才降低了爆发风险,并达到了迅速降低爆发风险的目的。这为在相似条件下快速降低突出风险和安全打开煤层提供了有效的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号