首页> 外文会议>World road congress >COMPREHENSIVE RISK MANAGEMENT IN ROAD MAINTENANCE – RISK ASSESSMENT AND HANDLING IN ROAD MAINTENANCE CONTRACTS IN
【24h】

COMPREHENSIVE RISK MANAGEMENT IN ROAD MAINTENANCE – RISK ASSESSMENT AND HANDLING IN ROAD MAINTENANCE CONTRACTS IN

机译:公路养护中的综合风险管理–中国公路养护合同中的风险评估和处理

获取原文

摘要

The Finnish Transport Agency (formerly the Finnish Road Administration) is responsiblefor preparing the maintenance policies for the road network. The transport andinfrastructure units of the Centres for Economic Development, Transport and theEnvironment (formerly Road Regions) carry out the operational activities and managementof regional roads. These units are responsible for the planning of regional roadmaintenance, tendering of maintenance contracts and monitoring implementation.In Finland the annual budget for road management is approximately € 530 million, of which€ 450 million is used for maintenance. The operative units carry the risks connected withthe implementation of maintenance contracts, such as risks in connection to increasedcost level, road user safety and occupational safety during contract implementation.Comprehensive risk management refers to risk assessment and preventive measures atall times during the planning, tendering and implementation phases of the roadmaintenance contracts. The risks of the regional contracts can be divided into operationaland safety risks. Operational risks are connected to the contract contents and presentedwork output. Safety risks are connected to the risks facing employees and other roadusers, which can result from the work itself (for example snow ploughing in the winter), orfrom external factors such as in the maintenance of railroad level crossings (hazard fromthe trains colliding with an employee or equipment).The Centre for Economic Development Transport and the Environment for North Savomade a risk assessment of the regional maintenance contracts and identified fundamentalsafety risks for example in the work carried out near water systems, risks connected withtraffic when working on the road, and risks from machines. The operational risks of amaintenance contract were connected to the accuracy of the baseline information such asthe number of traffic signs needing repair and the true condition of the gravel road networkat the beginning of the contract cycle.The participants evaluating the comprehensive risk assessment process found theassessment of operational risks more challenging than the assessment of safety risks,which was considered easiest.
机译:芬兰运输局(前称芬兰道路管理局)负责 制定道路网络的维护政策。运输和 经济发展,运输和世界贸易中心的基础设施部门 环境(以前是道路地区)开展运营活动和管理 区域道路。这些单位负责区域道路的规划 维护,维护合同的招标和监督实施。 在芬兰,道路管理的年度预算约为5.3亿欧元,其中 4.5亿欧元用于维护。执行单位承担与之相关的风险 维护合同的执行,例如与增加有关的风险 合同执行期间的成本水平,道路使用者安全和职业安全。 全面的风险管理指风险评估和预防措施。 在道路的规划,招标和实施阶段的所有时间 维护合同。区域合同的风险可分为操作风险 和安全风险。操作风险与合同内容相关并已提出 工作输出。安全风险与员工和其他道路面临的风险相关 用户,这可能是作品本身造成的(例如冬天的扫雪),或者 来自外部因素,例如铁路平交道口的维护(来自 与员工或设备相撞的火车)。 北萨沃省经济发展运输与环境中心 对区域维护合同进行了风险评估,并确定了根本原因 安全风险,例如在水系统附近进行的工作,与 在路上工作时的交通流量,以及来自机器的风险。一个的经营风险 维护合同与基线信息的准确性有关,例如 需要维修的交通标志的数量和砾石路网的真实状况 在合同周期开始时。 评估综合风险评估过程的参与者发现 评估操作风险比评估安全风险更具挑战性, 这被认为是最简单的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号