首页> 外文会议>International conference on transportation engineering >Analysis of Social Risk Causes of Rail Transit Construction Projects Based on DEMATEL-ISM
【24h】

Analysis of Social Risk Causes of Rail Transit Construction Projects Based on DEMATEL-ISM

机译:基于DEMATEL-ISM的轨道交通建设项目社会风险成因分析

获取原文

摘要

In order to prevent social instability of rail transit construction projects effectively, 15 factors caused rail transit social risk were extracted. Using the integration of decision-making trial and evaluation laboratory (DEMATEL) and the interpretive structure model(ISM), a structural model of risk cause system was established. The causes were divided into 4 categories: root causes, controllable causes, key causes, direct causes. The results show that safeguarding the fundamental interests of the masses is the key to control the social risk of the rail transit construction.
机译:为了有效防止轨道交通建设项目的社会不稳定,提取了15条造成轨道交通社会风险的因素。利用决策试验与评估实验室(DEMATEL)和解释结构模型(ISM)的集成,建立了风险原因系统的结构模型。原因分为4类:根本原因,可控原因,关键原因,直接原因。结果表明,维护群众的根本利益是控制轨道交通建设社会风险的关键。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号