首页> 外文会议>Moratuwa Engineering Research Conference >Investigation on elements and their fraction of housing construction cost
【24h】

Investigation on elements and their fraction of housing construction cost

机译:住房施工成本的要素及其分数调查

获取原文

摘要

Construction industry is predominantly projected cost based. Project cost can be identified as one of the main constraints of any kind of construction projects. Construction cost is the major portion of the project development cost. And yet every construction organization struggles to estimate the actual construction cost accurately prior to the construction. All stakeholders such as client, contractor, Quantity surveyors, engineers etc. try to estimate the construction cost with limited data available. This research study focused on the derivation of empirical relationships for each cost elements in construction cost of two-storied houses. The investigation is based on the previously prepared bill of quantities of two storied houses which gathered 45 number of bill of quantities for the analysis. This study sensitively analyzes the variation of cost according to the type of the house using footprint of the house as the variable parameter.
机译:建筑业主要是基于成本的。项目成本可以被确定为任何建筑项目的主要限制之一。建筑成本是项目开发成本的主要部分。然而,每个施工组织在建造之前努力准确地估算实际施工。所有利益相关者,如客户,承包商,数量测量师,工程师等。尝试使用有限的数据估算施工成本。该研究研究侧重于两层房屋施工成本中每个成本元素的经验关系的推导。调查基于先前准备的两栋房屋的数量票据,该房屋聚集了45个数量的分析。本研究敏感地使用房屋的占地面积作为变量参数来敏感地分析了成本的变化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号