首页> 外文会议>International Conference on Lightning Protection >Lightning overvoltage of rails and signalling cables in electrified/non-electrified section
【24h】

Lightning overvoltage of rails and signalling cables in electrified/non-electrified section

机译:电气化/非电气化部分的雷电过电压和信号电缆

获取原文

摘要

Effective and economical lightning protection measures are necessary for the railway signalling systems because suspended operation or train delays due to lightning damage may cause social disturbance. Railway signalling systems are mainly composed of signalling cables laid on the ground surface, rails and overhead power lines. The authors have measured lightning overvoltage of these components of railway signalling systems in the field. The measurement in a non-electrified section was conducted from 2010 to 2013, and the measurement in an electrified section has just started from 2015. This paper describes the measurement results in the electrified section and the correlation between lightning overvoltages of the components and lightning conditions, such as the stroke current and the strike position. Moreover, this paper indicates the difference of lightning overvoltages of signalling cables and rails between the electrified section and the non-electrified one.
机译:铁路信号系统所需的有效和经济的防雷措施是因为由于避雷损坏导致的暂停运行或火车延迟可能导致社交干扰。铁路信号系统主要由铺设在地面,轨道和架空电源线上的信号电缆组成。作者测量了该领域的铁路信号系统的这些组件的避雷过电压。从2010年至2013年进行了非电气化部分的测量,电气化部分中的测量刚刚从2015开始开始。本文介绍了电气化部分的测量结果以及部件的闪电过电压之间的相关性和避雷条件之间的相关性。 ,例如行程电流和击球位置。此外,本文表示信令电缆和轨道之间的闪电过电压的差值和非电气化的轨道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号