首页> 外文会议>Geotechnical frontiers >Managing Ground Deformation Risks on Underground Construction Projects in Urban Settings
【24h】

Managing Ground Deformation Risks on Underground Construction Projects in Urban Settings

机译:在城市环境中管理地下建设项目的地面变形风险

获取原文

摘要

An increasing number of soft ground tunnels are built in urban environments where it is crucial that existing infrastructure be protected from potential ground deformations resulting from construction. An important component of protecting this infrastructure is implementing best practices to engage third-party infrastructure owners and develop a ground deformation mitigation plan to ensure risks are fairly allocated among all parties. This approach requires early and close coordination between the project owner and the third parties. During solicitation of a project's construction contract, coordination should have already occurred and agreements concerning infrastructure protection requirements, included in the bid documents. This allows bidding parties to be aware of the agreed third-party requirements and allows accurate risk and cost assessment. After contract award, monitoring procedures and reporting protocols are important to keep third parties informed. This paper presents the best practices used on the DC Water Clean Rivers Project.
机译:越来越多的软接地隧道内部建造在城市环境中,至关重要的是,现有的基础设施免受施工产生的潜在地面变形。保护这一基础设施的一个重要组成部分正在实施聘请第三方基础设施所有者的最佳实践,并开发地面变形缓解计划,以确保风险在各方之间公积地分配。这种方法需要在项目所有者和第三方之间提前和密切协调。在项目的施工合同征求期间,应当已经发生协调和有关投标文件中包含的基础设施保护要求的协议。这允许招标缔约方意识到商定的第三方要求,并允许准确的风险和成本评估。合同奖励后,监测程序和报告议定书对于保留第三方通知的重要性是重要的。本文介绍了直流水清洁河流项目的最佳实践。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号