首页> 外文会议>Geotechnical frontiers >Development of a Large Warehouse Complex Overlying Slag, a Landfill, and Karst
【24h】

Development of a Large Warehouse Complex Overlying Slag, a Landfill, and Karst

机译:开发覆盖渣,垃圾填埋场和岩溶的大型仓库

获取原文

摘要

Work is underway to develop a 465-acre site to include six large warehouse facilities. The site was an industrial facility in the past, and portions of the site had been used as a disposal area for steel slag and industrial debris. The subsurface conditions include historical fills, buried underground structures, and an unregulated industrial waste landfill in addition to alluvial, glacial, and residual soils. This case study reviews Kleinfelder's site exploration, geo-hazards encountered onsite, and how the project team addressed these geo-hazards. Kleinfelder's site exploration program primarily used borings and test pits to evaluate subsurface conditions and supplemented those with selectively located air probes and geophysics to provide a better understanding in certain areas. Hazards considered in the development of the site include karst geology, potentially expansive slag fill, and building over an industrial landfill.
机译:正在开发一个占地465英亩的场地,其中包括六个大型仓库设施。该场地过去是工业设施,部分场地被用作钢渣和工业碎屑的处置区。除了冲积,冰川和残留的土壤,地下条件还包括历史填埋,地下掩埋结构以及未经监管的工业垃圾填埋场。本案例研究回顾了Kleinfelder的现场勘查,现场遇到的地质灾害以及项目团队如何解决这些地质灾害。克莱因费尔德(Kleinfelder)的现场勘探计划主要使用钻孔和测试坑来评估地下条件,并通过选择性定位的空气探头和地球物理学来补充这些条件,以更好地了解某些地区。该场地的开发中考虑的危险包括喀斯特地质,潜在的膨胀矿渣填充以及在工业垃圾填埋场上的建筑。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号