COMPARATIVE ANALYSIS OF OPEN PIT MINE SCHEDULING TECHNIQUES FOR STRATEGIC MINE PLANNING OF THE TINTAYA COPPER MINE IN PERU

机译:秘鲁TINAYA铜矿战略性规划露天矿调度技术的比较分析

获取原文

摘要

The mine scheduling process defines a mining sequence across the life of the mine and stipulates the amount of ore, waste, and specific blocks to be mined each year so that the highest economic return can be obtained under a number of constraints. There are a number of mine scheduling software packages available. Each claims to be the best scheduler by maximizing Net Present Value (NPV) or by minimizing overall mining costs. These mine scheduling programs follow different procedures and scheduling philosophies based on either mathematical or heuristic principles.There was no study in which the mine production scheduling procedures applied by these packages were discussed and compared. This paper evaluates four open pit mine scheduling programs recently developed and compares them in order to determine if significant differences exist among them. The same input data, which consist of a 3-D block model, an economic set of parameters, and the initial surface topography for a operating copper mine in Southern Peru, was used to test each technique. The following programs were investigated with respect to their ability to optimize the NPV for the case study.1) M821V1 Scheduler by Mintec;2) NPV Scheduler by Earthworks;3) Milawa Scheduler by Whittle Programming; and,4) Fundamental Tree Scheduling Method (FTSM) developed at the Colorado School of Mines.The results from this case study demonstrate that the scheduling software packages, Mintec, Earthworks, and Whittle obtained similar NPV's, while FTSM scheduler gave a six percent higher NPV than the other schedulers.
机译:矿山调度过程定义了整个矿山寿命中的采矿顺序,并规定了每年要开采的矿石,废物和特定区块的数量,以便在许多限制条件下可以获得最高的经济回报。有许多可用的排雷计划软件包。通过最大化净现值(NPV)或通过最小化总体采矿成本,每个人都声称是最佳的调度程序。这些矿山调度程序基于数学或启发式原理,遵循不同的程序和调度原理。 没有研究讨论和比较这些软件包所应用的矿山生产调度程序。本文对最近开发的四个露天矿调度程序进行了评估,并进行了比较,以确定它们之间是否存在显着差异。使用相同的输入数据(包括3-D块模型,一组经济的参数以及秘鲁南部正在运营的铜矿的初始表面地形)来测试每种技术。研究了以下程序是否具有针对案例研究优化NPV的能力。 1)Mintec的M821V1 Scheduler; 2)Earthworks的NPV计划程序; 3)通过Whittle编程实现Milawa Scheduler;和, 4)科罗拉多矿业学院开发了基本树调度方法(FTSM)。 此案例研究的结果表明,调度软件包Mintec,Earthworks和Whittle获得了类似的NPV,而FTSM调度程序的NPV比其他调度程序高了6%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号