首页> 外文会议>International Conference on Hydropower >STARCH TO BUILD STONE TWO ARCHED DAM CONSTRUCTION TECHNICAL AND QUALITY CONTROL RESEARCHES
【24h】

STARCH TO BUILD STONE TWO ARCHED DAM CONSTRUCTION TECHNICAL AND QUALITY CONTROL RESEARCHES

机译:从建设到建设两座拱坝的施工技术和质量控制研究

获取原文

摘要

The 2 banana river level hub projects of hydroelectric station land place Hubei province crane summit county, valley belongs to hole yard water department, Lou 2 water level tributaries. This large dams of hydroelectric station builds stone two arched dams to starch, this paper has introduced dam body to build, build the new technology that construction adopts in the aspect of quality control: ( 1 ) adopting " the vertical law of building " , " triangle the law of building " build to build, entire dam surface divides into tape synchronism to build litre construction technology; (2) support dam body self combination dam body upper reaches go to meet water surface net spray to set up concrete defence seep technology; ( 3 ) application diamond rig substitute dig examination hollow law detection build body unit weight and press the water test quality control method of building body thorough water rate with inspection and control regularly.
机译:2香蕉河级枢纽项目的水电站占地面居湖北省起重机峰会县,山谷属于洞院水处,楼2水位支流。这款大型水电站的大型水坝为淀粉构建了石头,这篇论文推出了大坝身体建设,建立了建设采用质量控制方面的新技术:(1)采用“纵向建筑法”,“三角形建筑“建立建设,整个大坝表面划分为胶带同步,建立升施工技术; (2)支撑坝体自动组合坝体上游达到水面网喷雾,建立混​​凝土防御技术; (3)应用钻石钻机替代挖掘检测中空律检测构建体单元重量,按压水测试质量控制方法,经常检测和控制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号